Using 220 kV submarine and onshore cables cables to connect Glanagow and Raffeen via a busy shipping route - 30.5 km total length
Přejít na stránkuTurnkey project for 380 kV cable system for TenneT TSO - 132 km total length
Přejít na stránkuSuccessfully completed a vital and complex project to improve electrical transmission in the Auckland area.
Přejít na stránkuTurnkey solution including planning, material production, installation and testing for a wind farm in the German North Sea - 51 km total length
Přejít na stránkuQaddy® is an integrated cable reel, pay-off and drum trolley, which significantly improves working conditions for electricians with its revolutionary ergonomic design.
Přejít na stránkuThe turnkey solution comprised the longest HVAC submarine cable in the world at this time installed in one complete length and at this voltage.
Přejít na stránkuThe national power grids between Denmark and Norway are connected through four DC-links crossing the Skagerrak strait, capable to carrying 1700 MW of renewable energy to the two countries’ energy mix. One of the cables, the Skagerrak 2, was damaged due to external impact.
Přejít na stránkuBreezy southern Gotland was an early favorite for wind power. By the late 1990’s, the Swedish island had an installed wind power capacity of 40 MW (megawatt). To cope with additional wind power generation, the island grid needed an improved way of maintaining power quality.
Přejít na stránkuNKT ist ein Hauptlieferant für zwei der Korridorprojekte, die für die Energiewende in Deutschland unverzichtbar sind. SuedOstLink wird die weltweit erste große kommerzielle 525 kV VPE HGÜ 2,0 GW-Verbindungsleitung und SuedLink wird die weltweit längste unterirdische HGÜ-Stromverbindung.