Doporučená vyhledávání
Filtrujte a stahujte konkrétní informace podle klíčových slov.
NKT cables to bring clean power to over 1.5 million homes with Poland’s first offshore wind farm.
Supporting electric transportation with new charging connections for heavy vehicles
Stöttar elektrisk transport med nya stationer för tung fordonsladdning
NKT introduces the next generation of power distribution cables manufactured with low carbon materials
NKT introducerar nästa generation kraftdistributionskablar tillverkade av material med lågt koldioxidavtryck
Breezy southern Gotland was an early favorite for wind power. By the late 1990’s, the Swedish island had an installed wind power capacity of 40 MW (megawatt). To cope with additional wind power generation, the island grid needed an improved way of maintaining power quality.
The Horns Rev 3 wind farm is located in the North Sea, about 30 km off the western-most point of Denmark, Blåvands Huk, and not far from the city of Esbjerg. The 400 MW (megawatt) wind farm has the capacity to supply electricity to around 400,000 households.
Our pioneering HVDC transmission cable system was laid in 1953, between Västervik and Ygne. The link had a rated voltage of 100 kV (kilovolt) and a transmission capacity of 20 MW (megawatt).
The Caithness-Moray project represents a £1.1bn capital investment by SSEN, centred on a submarine cable capable of carrying up to 1,200MW beneath the Moray Firth.
In 2011 NKT completed a cable system solution for the Bayonne Energy Center near the New York Harbor, which generates 512 MW of electricity.
NKT toimittaa 110 kV -kaapelit maatuulivoimalaan Suomessa
Naše výrobky
O NKT
Kariéra
Obraťte se na nás
Oznamte své pochyby
Následuje nás
© NKT A/S