Doporučená vyhledávání
NKT cable system connect Moray East offshore wind farm to shore
Client
Total cable route lengths
Location
Duration
Quantity of order
The development of the Moray East offshore wind farm required a reliable power transmission link.
NKT manufactured, transported and installed approximately 180 km cable in three circuits.
Moray East reference flyer
Naše výrobky
O NKT
Kariéra
Obraťte se na nás
Oznamte své pochyby
Následuje nás
© NKT A/S